2-3-2 Work Schedule — What the Numbers Mean and How the Cycle Runs

A 2-3-2 schedule repeats three working blocks of 2, 3 and 2 days inside a fourteen-day loop. Here is the whole cycle, the hours it produces, and where the overtime lands.

14-day loop7 shifts per cycle42 h a week

The shift calendar

First ten days — Crew A, 2-3-2

  1. Mon 4DAY12 h
  2. Tue 5DAY12 h
  3. Wed 6OFF—
  4. Thu 7OFF—
  5. Fri 8DAY12 h
  6. Sat 9DAY12 h
  7. Sun 10DAY12 h
  8. Mon 11OFF—
  9. Tue 12OFF—
  10. Wed 13DAY12 h

Crew A · 2-3-2 · overtime after 40 h

FLSA default: overtime after 40 h in each 7-day workweek; over 28 days that is 160 h.

  • 42.0average hours a week84 h per 14-day cycle
  • 2,184hours a year1,976 regular + 208 overtime
  • 4.0overtime h a week26 of 52 weeks carry overtime
  • $91,520gross a year$40/h · OT ×1.5
  • 25full weekends off624 weekend hours a year
  • 3longest break, days12 h shortest rest · 0 night→day
Hours by workweek (Sunday–Saturday), first 8 weeks
Week ofHoursRegularOvertime
2027-01-0348.040.08.0
2027-01-1036.036.0—
2027-01-1748.040.08.0
2027-01-2436.036.0—
2027-01-3148.040.08.0
2027-02-0736.036.0—
2027-02-1448.040.08.0
2027-02-2136.036.0—

Crew A · 2-3-2 · 42.0 h a week · 208 h overtime a year at 40 h · 3-day longest break

January 2027
SunMonTueWedThuFriSat
1OFF2OFF
3OFF4DAY5DAY6OFF7OFF8DAY9DAY
10DAY11OFF12OFF13DAY14DAY15OFF16OFF
17OFF18DAY19DAY20OFF21OFF22DAY23DAY
24DAY25OFF26OFF27DAY28DAY29OFF30OFF
31OFF
  • DAY Day 07:00–19:00
  • NIGHT Night 19:00–07:00
  • OFF Off
Compare with another rotation

Both columns use the same 52 workweeks, the same 40-hour threshold, and the same $40/h at OT ×1.5.

2-3-2 versus DuPont
Measure2-3-2DuPont
Cycle length14 days28 days
Hours per cycle84 h168 h
Average week42.0 h42.0 h
Overtime a year208 h468 h
Full weekends off2525
Longest break3 days7 days
Shortest rest12 h12 h
Night → day turns00
Weekend hours a year624 h624 h
Gross at this rate$91,520$96,720

The cycle, block by block

A single crew: 14 days, 7 shifts, no round-the-clock coverage claimed.

Crew A — 14-day cycle, 12-hour shifts
BlockDaysLengthShiftHours so far
2D1–22Day 07:00–19:0024 h
2O3–42Off24 h
3D5–73Day 07:00–19:0060 h
2O8–92Off60 h
2D10–112Day 07:00–19:0084 h
3O12–143Off84 h
14-day cycle1–14142D-2O-3D-2O-2D-3O84 h
All crews — shifts, hours and the average week
CrewBlock shorthandShiftsHours / cycleAvg h / week
Crew A2D-2O-3D-2O-2D-3O784 h42.0 h

Shorthand reads as count then code: 4N is four nights, 3O three off, 7O a seven-day break. Hours are counted from the first block of the cycle. The pattern repeats, so a month that begins before the chosen start date shows where that earlier phase would have placed the crew.

The name counts working blocks, not shifts

Two-three-two is a description of the work blocks inside one cycle: two days on, then a break, three days on, then a break, two days on, then a longer break. Read the breaks as well and the same fortnight is 2 on, 2 off, 3 on, 2 off, 2 on, 3 off — which is why the identical pattern is also sold as 2-2-3 and as a Panama schedule.

That naming collision confuses a lot of people who are comparing job offers. If one employer advertises a 2-3-2 and another advertises a 2-2-3, the honest first question is not which is better but whether they mean the same fourteen days. Very often they do, and the only difference is which number the recruiter chose to put first.

Fourteen days, seven shifts, eighty-four hours

The arithmetic is short enough to check on paper. In fourteen days the pattern works 2 + 3 + 2 = 7 shifts. At twelve hours a shift that is 84 hours per cycle, and 84 divided by two weeks is 42 hours a week on average. A full year at that rate is 182 shifts, or 2,184 hours.

Forty-two is an average, and averages are where shift-pay arguments start. Consecutive seven-day windows over this pattern do not all contain the same number of shifts: depending on where the workweek boundary falls you can get a 48-hour week next to a 36-hour week, or a 60-hour week next to a 24-hour week. The cards above print both the average and the week-by-week split so nobody has to guess which one they are being paid on.

Where the overtime actually lands

On a standard forty-hour threshold, a 48-hour week carries 8 overtime hours and a 36-hour week carries none. That is the shape most 2-3-2 crews live with: one week with a little overtime, one week under the line, repeating. Over a year measured Sunday to Saturday at a Monday-anchored cycle the tool counts 2,184 hours with 208 of them overtime; change the workweek start to Monday and the same shifts produce far more overtime hours because the boundary slices the long week differently.

Which number is correct is not a maths question, it is a question about the employer's established workweek. A workweek is a fixed, regularly recurring period of 168 hours — seven consecutive 24-hour periods — and 29 CFR 778.105 is explicit that it need not coincide with the calendar week. Once set, it stays fixed. The control on this page exists so you can see what your employer's choice costs you instead of accepting an average.

Starting on the three-day block

Not every 2-3-2 starts on the two-day block. If your first day at a new job falls in the middle of someone else's cycle, the pattern you actually work begins with the three-day run. The "first block" control shifts the cycle index, so the calendar can start on either block without retyping the pattern.

This matters more than it looks. A shift of four days moves every weekend in the year: the weekends you get off, the weekends you work, and which holiday lands on your long break. Comparing two job offers with the same pattern but different phase is comparing two different lives, and it is worth drawing both before deciding.

2-3-2 against the alternatives

Against a DuPont rotation, the 2-3-2 trades the seven-day break for more frequent short breaks: the longest run off is three days, not seven, but it comes around every fortnight. Against a 48/96 fire schedule it is far fewer hours — 42 a week instead of 56 — and against a straight five-day week it is twelve fewer working days a year at the cost of working nights and weekends.

The compare drawer under the calendar puts any two of those side by side on the same twelve measures, using the same threshold and the same rate, which is the only fair way to read them. Numbers computed under different assumptions are not a comparison, they are two advertisements.

Questions this page gets asked

Is 2-3-2 the same as 2-2-3?

Usually yes. Both names describe the same fourteen-day block: 2 on, 2 off, 3 on, 2 off, 2 on, 3 off. 2-3-2 counts the three working blocks (2, 3, 2 days); 2-2-3 describes the full alternation of work and rest. If someone quotes you a 2-3-2 with different block lengths, ask for the exact sequence rather than the name.

How many hours a week is a 2-3-2 schedule?

Forty-two on average, at twelve-hour shifts: seven shifts of twelve hours is 84 hours per fourteen-day cycle, and 84 divided by two is 42. The individual weeks are not all 42 — they alternate above and below depending on where the workweek boundary falls, which is why the page prints the week-by-week split.

Does 2-3-2 give you every other weekend off?

On the standard fourteen-day block, yes: the pattern settles into alternating weekends, with one full weekend off and one with a shift on it. That is 25 full weekends off at the default anchor and 26 when the cycle lines up the other way, which the card above counts from the actual calendar rather than from the pattern name.

What is the longest break on a 2-3-2?

Three consecutive days off, and it comes round every fourteen days. That is the main trade against a DuPont rotation, which has a seven-day break but only once every four weeks. The longest-break card and the compare drawer show both numbers on the same screen.

Can I swap shifts without breaking the pattern?

The calendar shows which crew covers the other side of each day, so a swap is a conversation with a specific crew rather than a guess. The tool does not model swaps — it draws the pattern — but exporting the CSV gives you the full roster matrix to mark swaps on, and re-importing the result is as simple as editing a few letters.

Every number on this page is computed from the pattern and the start date in your browser. The calendar is a model of the rotation, not a payroll record: check your own contract, workweek definition and any § 207(k) election with whoever runs payroll before relying on a figure.